Two-way traffic available during MWRA pipe rehab in Lower Mills

from The Dorchester Reporter

Rehabilitation and replacement work of a major water pipeline focused on Adams St. on Monday, opposite the entrance and exit of the Baker Chocolate Factory condominiums. According to an update from the Massachusetts Water Resources Authority, two-way traffic is being maintained, and residents of the condos will be able to head into Boston or Milton. (Read the full story here.)

Leave a Reply

Your email address will not be published. Required fields are marked *